

Model Railways 1990 January
Paypal - the easy simple payment option.
3-5 working days for small orders. Up to 10 days for larger orders.
14-day Returns if unopened. Buyer pays for return postage.
All pictures are for illustration only.
Overseas? Please email us to discuss your requirements.
Good condition.
Camera and Comment. A look at Low Level station buildings. (Mike Vincent).
Picture, Leighton Buzzard station.
Construction. GWR coaching stock. Farewell to 4mm scale. Some selected items of 4mm scale coaching stock made prior to a change to 7mm scale. Text, pictures. (Jim Whittaker).
Electronics. Wiring your layout, the basics. (C.J. Bowes).
Photofile: LNER open wagons, 13-ton steel bodied high goods wagons. Text, pictures. (Eric Kemp).
The Model Railway News and Model Railways. 65 years of Model Railways magazine.
From the Prorotype: The Ins and Outs. Looking at platform workings at Bradford Exchange station. Text, pictures, timetables. (John Cockcroft).
Construction: Locomotives for Kerry bridge. A description of some of the original locomotives from this 7mm narrow gauge layout. Text, pictures. (Paul Windle).
Construction: building RJH's new class 90 kit, and also a visit to Hornby's Margate factory to see the final stages of their new model locomotive.
Your review appreciation cannot be sent
Report comment
Report sent
Your report cannot be sent
Write your review
Review sent
Your review cannot be sent
Model Railways 1990 January
check_circle
check_circle