

Model Railway Constructor 1980 September
Paypal - the easy simple payment option.
3-5 working days for small orders. Up to 10 days for larger orders.
14-day Returns if unopened. Buyer pays for return postage.
All pictures are for illustration only.
Overseas? Please email us to discuss your requirements.
Good condition.
Detailing the Airfix B-set. Making a good model even better. Text, diagrams, pictures. (R.D. Naylor).
Picture, ex-GWR 45xx class 2-6-2T No.4566 heads away from St Erth with a B-set forming the St Ives branch train. The date is 19 April 1951. B/W.
Layout: the Gebirsbahn Line Mk2. An N-gauge layout based on West German practice. Text, pictures. (Harry Bradburn).
Electrics: Train length routing, an automatic system for more interesting operation. Text, circuit diagrams. (G.A. Hope).
Plans Page: LBSCR Push-pull units part 3. Text, drawings, pictures. (Trailer brake third, Trailer composite). (Terrier).
Layout: the Porthcurno Connection. A 3mm scale TT-gauge layout. Text, pictures. (M.H. Bradley).
Train of Thought...on constructing. Text. (Peter D. Jones).
Spondon, a Midland station and its traffic. Text, pictures, diagrams, signal box diagram, track layouts. (Peter Kazmierczak).
An inexpensive wheel cleaning brush. Made from a small wire brush (brass bristles), wires connect to the track. Text, picture. (J. Tandy).
The continental scene. Austrian motive power, prototypes and models. Text, pictures. (John Christie).
Your review appreciation cannot be sent
Report comment
Report sent
Your report cannot be sent
Write your review
Review sent
Your review cannot be sent
Model Railway Constructor 1980 September
check_circle
check_circle