Model Railway Constructor 1982 February
search
  • Model Railway Constructor 1982 February

MRC 1982 February

£0.75
Tax included

Model Railway Constructor 1982 February

Quantity
Last items in stock

 

Paypal - the easy simple payment option.

 

3-5 working days for small orders. Up to 10 days for larger orders.

 

14-day Returns if unopened. Buyer pays for return postage.

 

All pictures are for illustration only.

 

Overseas? Please email us to discuss your requirements.

Good condition.

Model building construction part 4, walls. Text, diagrams, pictures. (Stephen Williams).
Unemployment and the modeller, a list of jobs that can be done. (Bob Haskins).
Layout: Clochemerle-en-Beaujolais (SNCF) part 1, a revitalised classical HO-gauge layout. (Nick Wood).
Building a layout part 13, point rodding part 1. Text and diagrams. (Mike Sargent).
Plans Page: LBSCR push-pull units part 5. Text, pictures, drawings. (Terrier).
More on catenary, model operating experiences. Text. (J.A. Hart).
Layout: Swaledale, the N-gauge layout of the Preston and District MRS. (Alan Jackson).
The BR class 20s, prototype variations and the model. Text, diagrams, B/W pictures. (Peter Kazmierczak).
Ex-GER class E22 0-6-0T (LNER class J65). A conversion from a Mainline class J72 model. Text, diagrams, picture. (M. Smye).
Coalfield loads. Filling the open wagon. Text, diagrams. (N.C. Wilmot).
Renovating die-cast toys. repairs to an old Dinky taxi. Text. (C. Hood).
Drawings, BR standard class 3 2-6-0.
Drawings, BR standard class 9F 2-10-0.

MC82B.B092
1 Item
Used
Comments (0)
No customer reviews for the moment.